Question: USING R CODE: Simulate time series of length 100 from an AR(1) model with equal to 0.9. Estimate the parameter of the model, make prediction
USING R CODE:
Simulate time series of length 100 from an AR(1) model with equal to 0.9.
Estimate the parameter of the model, make prediction for 1 to 10 steps ahead, and make a time plot
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
