Question: Using the asymmetrical distribution, what is the probability that the project will be completed within (based on the path with the longest expected time): 21

Using the asymmetrical distribution, what is the

Using the asymmetrical distribution, what is the probability that the project will be completed within (based on the path with the longest expected time): 21 days, 22 days, and 25 days Activity D7 A A8 G5 B C Optimistic Most Likely Pessimistic Time (a) Time (m) Time (b) 6.5 7.5 14.5 8.5 10.5 12.5 2.5 3.5 4.5 6.5 7.5 8.5 5.5 5.5 9.5 5.5 7.5 9.5 4.6 6.5 8.5 2.5 3.5 3.5 Start C3 E6 End D E F B10 F7 H3 G