Question: Using the Network diagram below, drag and drop the labels into their correct locations. Identify a correct path along the network diagram. Select one: A

Using the Network diagram below, drag and drop the labels into their correct locations.
Identify a correct path along the network diagram.
Select one:
A B E
B A E
A E B
B E A
E A B
Identify a correct path along the network diagram.
Select one:
C D E
E C D
D C E
E D C
C E D
Calculate the project time for one of two paths. (Note: There are two paths, you are being asked to calculate one of them, the second path will be calculated in subsequent question.)
Calculate the project time for the second paths. (Note: There are two paths, you were asked to calculate one of them in a previous question, now calculate the second path.)
Which path is the critical path?
Select one or more:
A B E
C D E
B A E
D C E
A E B
Table 1 defines a two-machine maintenance project consisting of five activities. Since management has had substantial experience with similar projects, the maintenance activity times are considered known; hence, a single time estimate is provided for each activity. Table 1: Work Breakdown Structure for a Two-Machine Maintenance Project