Question: Using the resources provided in class, determine how many scrapers should be used and what the production rate will be in bank cubic yards (
Using the resources provided in class, determine how many scrapers should be used and what the production rate will be in bank cubic yards bcy per hour. The material to be hauled is earth, wet. It has a swell factor of and a unit weight of lbbcy The expected rolling resistance for the wellmaintained haul road is Assume a min load time and that the average load will be of the heaped capacity. To account for both acceleration and deceleration, use an average speed of mph over a distance of ft Use a min hour efficiency factor. The total length of the haul is ft and has the following individual segments when moving from cut to fill: ft at a grade ft at a grade ft at a grade You are required to select the appropriate scraper equipped with a push tractor excluding the use of the E model for this operation. Ensure that any specifications utilized, such as scraper applicable weights or otherwise, are sourced from credible references and appropriately documented
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
