Question: Using the table below, calculate the activity-based costing activity rate for each pool; calculate missing information in the Activity Level per Product Table, and determine
Using the table below, calculate the activity-based costing activity rate for each pool; calculate missing information in the Activity Level per Product Table, and determine the expected overhead cost allocation for Product 3 using the table below. (10 points)
| Activity Rate | ||||||||
| Activity Cost Pool | Activity Driver | Expected Activity Level | Expected Overhead Cost Assigned to Pool | Activity Rate | ||||
| Craftsmanship | Direct Labor | 1,500 | 600,000 |
| per DLH | |||
| Set-up | Batches | 10 | 75,000 |
| per batch | |||
| Plant Services | Square Footage | 200,000 | 3,600,000 |
| per Ft2 | |||
| Activity Level per Product | ||||||||
| Product 1 | Product 2 | Product 3 | Total Activity Level | |||||
| Craftsmanship | 250 | 450 |
| |||||
| Set-up | 1 | 3 |
| |||||
| Plant Services | 50,000 | 25,000 |
| |||||
| Product 3 | ||||||||
| Craftsmanship | ||||||||
| Set-up |
| |||||||
| Plant Services | ||||||||
| Total Costs Assigned |
| |||||||
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
