Question: Using the table below, sketch out an AON Network using the average or mean time estimates for each task, and calculate the critical path (

Using the table below, sketch out an AON Network
using the average or mean time estimates for each
task, and calculate the critical path(s) using mean
task times.
Question 6
Using the PERT method, calculate each task time
estimate, standard deviation, and variance. Enter
your answer as a number, rounded to 2 decimals (0.50
or 3.67 ; not .5 or 3.66 or 3.6667) This response format
requires trailing zeroes, meaning if your answer is 2.2,
enter it as 2.20.
 Using the table below, sketch out an AON Network using the