Question: Using the Webster Model, determine the optimal cycle length for the intersection. Assume lost times equal to 3 . 5 s e c phase, a
Using the Webster Model, determine the optimal cycle length for the intersection. Assume lost times equal to phase, a yellow interval equal to seconds, and a saturation flow rate of hrlane for all lane types.
# The intersection shown below has the following phasing scheme;
Phase is for the EB and WB leftturning movements;
Phase is for the EB and WB through and rightturning movements; Phase is for the NB and SB left, through and right movements.
The equivalent hourly flows at the intersection are as shown below:
tableEastboundWestbound,Northbound,SouthboundLTRLTRLTRLTR