Question: Using the Webster Model, determine the optimal cycle length for the intersection. Assume lost times equal to 3 . 5 s e c phase, a

Using the Webster Model, determine the optimal cycle length for the intersection. Assume lost times equal to 3.5sec phase, a yellow interval equal to 3 seconds, and a saturation flow rate of 1800pc hr/lane for all lane types.
#3. The intersection shown below has the following phasing scheme;
Phase A is for the EB and WB left-turning movements;
Phase B is for the EB and WB through and right-turning movements; ] Phase C is for the NB and SB left, through and right movements.
The equivalent hourly flows at the intersection are as shown below:
\table[[Eastbound,Westbound,Northbound,Southbound],[L,T,R,L,T,R,L,T,R,L,T,R],[280,850,80,320,700,120,50,280,40,35,360,10]]
Using the Webster Model, determine the optimal

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!