Question: v 2 4 . 1 ) A manager is comparing the total maintenance ( preventive plus breakdown ) cost curves for two scenarios. The graphs
v
A manager is comparing the total maintenance preventive plus breakdown cost curves for two scenarios. The graphs have maintenance commitment on the axis and costs on the axis. Scenario A includes the direct breakdown maintenance costs, while Scenario B includes the "full" direct and indirect breakdown maintenance costs. Which of the following should the manager notice when going from Scenario A to Scenario B
a Total cost is decreased.
b Optimal point is moved to the left.
c Optimal point is moved to the right.
d Preventative maintenance cost slope is increased.
e None of the above
Which one of the following is NOT necessary to identify the optimal maintenance policy?
a historical data on maintenance costs
b cost of performing the analysis
c breakdown probabilities
d breakdown occurrences
e repair times
Effective use of MRP and other dependent demand models does not require which of the following?
a master production schedule
b bill of materials
c inventory availability
d lead times
e cost of individual components
Gross material requirements do not take into account the amount of inventory on hand.
a TRUE
b FALSE
Which of the following is NOT a potential cause of the bullwhip effect?
a shortage gaming
b channel coordination
c order batching
d demand forecast errors
e price fluctuations
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock