Question: value 3.57 points Problem 4-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the
value 3.57 points Problem 4-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company Pr Direct materials Direct labor hours Machine hours Batches Volume Engineering modifications Number of customers Market price 15 per unit 0 4 DLH per unit 15 DLH per und 0.3 MH per unit 1.1 MH per unit 100 batches 200 batches 10,000 units 11 modifications 500 customers 5 24 per unit 2,000 units 55 modifications 400 customers $34 per unit $ 95 per unit The company's direct labor rate is $20 per direct labor hour (DLH) Additional information follows Costs Driver Indirect manufacturing Engineering support24,500 Engineering modifications Electricity Setup costs 20,800 Machine hours 2,000 Batches Nonmanufacturing Customer service 71,000 Number of customers Required: (Round your per unit cost answers to 2 decimal places and other answers to nearest whole number. Loss amounts should be indicated with minus sign.) 1. Compute the manufacturing cost per unit using the plantwide overhead rate based on direct labor hours
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
