Question: Value Engineering and Project Management: Final Project (20 Marks) Q1: Draw the network for the activities in the table below by using Primavera Software OR

Value Engineering and Project Management: Final
Value Engineering and Project Management: Final Project (20 Marks) Q1: Draw the network for the activities in the table below by using Primavera Software OR MS Project software package. All time durations are in days. No. Task Sub-task Expected Predecessor Relation Lag Time 1 Start 0 2 Mobilization 4 1 3 Surveying 2 SS 4 Excavation 5 Blinding 4 6 Footings FS 2 7 5 8 7 9 8 FF 1 10 8,9 11 10 12 10 13 Column Necks 6 14 Backfilling 6 15 Grade beams 14 16 Slab on grade 15 FS 3 17 End 0 16 - Add task to the beginning of the project to calculate the project duration. - Make the start of the project on 1/6/2022. - Show Critical Path (Free Float). 2 4 3 Survey work Framework 5 Steel reinforcement 4 Pouring Concrete 1 Curing 3 De-shuttering 2 2 2 4 3 2 3

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!