Question: Variable manufacturing overhead costs $83160 Fixed manufacturing overhead costs $27720 Normal production level in labor hours 22100 Normal production level in units 5775 Standard labor
Variable manufacturing overhead costs $83160 Fixed manufacturing overhead costs $27720 Normal production level in labor hours 22100 Normal production level in units 5775 Standard labor hours per unit 4
During the year, 5600 units were produced, 18340 hours were worked, and the actual manufacturing overhead was $112560. Actual fixed manufacturing overhead costs equaled budgeted fixed manufacturing overhead costs. Overhead is applied on the basis of direct labor hours. What is the Vaughn's total overhead variance?
Step by Step Solution
There are 3 Steps involved in it
To calculate Vaughns total overhead variance we first need to determine the fo... View full answer