Question: vertical control surveying. datum for orthemetric heights / Problem No 9 - What is the elevation correction between a level and a measuring rod that

vertical control surveying.
datum for orthemetric heights/
Problem No 9-What is the elevation correction between a level and a measuring rod that is 1000.000
feet apart for both curvature of the earth, and the correction for the earth's curvature and refraction?
Surface of the earth correction is equal to 0.0239F2 and for surface of the earth and refraction is
0.0206F2. Where F is the distance divided by 1000(20 points)
vertical control surveying. datum for orthemetric