Question: Wall Editing :v Ev v Av Ov A AB I U Dv Av A Question 2: Job Costing vs. ABC Costing Suggested time: 45 minutes
Wall Editing :v Ev v Av Ov A AB I U Dv Av A Question 2: Job Costing vs. ABC Costing Suggested time: 45 minutes Answer following questions based on the scenario of Zany Brainy: Zany Brainy Corp. manufactures two types of lamps. Home size and Industry size lamps. Company produces 10,000 Home size lamps and 2,000 Industry size lamps. Following is the data provided about these two products, Total Home size lamp Industry size lamp $15 $16.00 S10 $16.00 0.50 0.7 Direct materials per unit Direct manufacturing labour rate per urit Direct labour hours per unit Set up costs Lamps produced per patch Set up hour per patch Advertising CONTA $110,000 200 50 1 3 S150 000 Wall Editing :v Ev v Av Ov A AB I U Dv Av A Question 2: Job Costing vs. ABC Costing Suggested time: 45 minutes Answer following questions based on the scenario of Zany Brainy: Zany Brainy Corp. manufactures two types of lamps. Home size and Industry size lamps. Company produces 10,000 Home size lamps and 2,000 Industry size lamps. Following is the data provided about these two products, Total Home size lamp Industry size lamp $15 $16.00 S10 $16.00 0.50 0.7 Direct materials per unit Direct manufacturing labour rate per urit Direct labour hours per unit Set up costs Lamps produced per patch Set up hour per patch Advertising CONTA $110,000 200 50 1 3 S150 000
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
