Question: WATER POLLUTION AND ITS TREATMENT TECHNOLOGIES PROBLEMS ( II ) Problem 5 . - A wastewater treatment plant treats an average daily flow of 9

WATER POLLUTION AND ITS TREATMENT TECHNOLOGIES PROBLEMS (II)
Problem 5.- A wastewater treatment plant treats an average daily flow of 91500m3 from a residential area. In this plant there is disused channel that could be exploited as a sand removal unit. It has the following dimensions: 9.10m(length)1.50m(width)2.10m(height).
Particles size distribution is given in the table below. Determinations indicate that these particles' specific relative mass is 2.65.
\table[[% mass,40,2,20,10,5],[diameter (mm),2.0,1.0,0.5,0.3,0.2]]
a) This unit is expected to remove at least 80% of the sand. Is this channel adequate to fulfill this requirement?
b) Determine the mass of particles (in %) that would be removed in this channel.
Assume that the efficiency of collection is the ratio between the real length and the theoretical length to capture 100% of the particles of a specific diameter.
DATA Viscosity H2O=9.9510-4Pa*S
WATER POLLUTION AND ITS TREATMENT TECHNOLOGIES

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!