Question: WATERWAYS CONTINUING PROBLEM Chapter 2 4 ( This is a continuation of the Waterways Problem from Chapters 1 9 through 2 3 . ) WCP
WATERWAYS CONTINUING PROBLEM
Chapter
This is a continuation of the Waterways Problem from Chapters through
WCP Waterways Corporation is continuing its budget preparations. Waterways had the following
static budget and overhead costs for March.
Waterways Corporation Waterways Corporation
Manufacturing Overhead Budget Static Manufacturing Overhead Costs Actual
For the Month of March For the Month of March
Budgeted production in units Production in units
Budgeted costs Costs
Indirect materials $ Indirect materials $
Indirect labor Indirect labor
Utilities Utilities
Maintenance Maintenance
Salaries Salaries
Depreciation Depreciation
Property taxes Property taxes
Insurance Insurance
Janitorial Janitorial
Total budgeted costs $ Total costs $
Waterways produced units in March rather than the budgeted number of units.
Instructions
a Prepare a flexible overhead budget based on the following amounts produced.
units
units
units
units
units
b Prepare a flexible budget report showing the differences favorable and unfavorable in
manufacturing overhead costs for the month of March.
c Prepare a responsibility report for the manufacturing overhead for March, assuming only variable
costs are controllable.
Step by Step Solution
There are 3 Steps involved in it