Question: We discussed this 6-job, 4-machine job shop scheduling problem using the MWKR dispatching rule in the class: Job i 1 2 3 4 5 6

We discussed this 6-job, 4-machine job shop

We discussed this 6-job, 4-machine job shop scheduling problem using the MWKR dispatching rule in the class: Job i 1 2 3 4 5 6 1 6/A 4/A 3/D 5/B 3/A 4/C Operations 2 3 8/B 13/C 1/B 4/C 8/B 6/A 10/A 15/C 4/B 6/D 2/A 4/B 4 5/D 3/D 4/C 4/D 4/C 5/D If the due dates for the six jobs are di 40, d2 = 60, d3 45, d4 = 50, ds = 55, do = 60, respectively, use the CR (Critical Ratio) dispatching rule to schedule these 6 jobs, and draw a Gantt chart for your result. What is Cmax in the result? (Notice: Show your steps in detail in this question) We discussed this 6-job, 4-machine job shop scheduling problem using the MWKR dispatching rule in the class: Job i 1 2 3 4 5 6 1 6/A 4/A 3/D 5/B 3/A 4/C Operations 2 3 8/B 13/C 1/B 4/C 8/B 6/A 10/A 15/C 4/B 6/D 2/A 4/B 4 5/D 3/D 4/C 4/D 4/C 5/D If the due dates for the six jobs are di 40, d2 = 60, d3 45, d4 = 50, ds = 55, do = 60, respectively, use the CR (Critical Ratio) dispatching rule to schedule these 6 jobs, and draw a Gantt chart for your result. What is Cmax in the result? (Notice: Show your steps in detail in this question)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!