Question: We need to install a new cable network between the 1 0 nodes shown in Graph G below for the least total cost . The

We need to install a new cable network between the 10 nodes shown in Graph G below for the least total
cost. The weighted graph G shows the new cable's installation cost along each path.
(i) Find the minimum spanning tree for this graph G using Prim's Algorithm. Consider 'S' as starting vertex.
(ii) Calculate the Total cost.
We need to install a new cable network between

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer