Question: We want to develop a double-sampling plan where n1 = n2 (see picture above). Here are the needed parameters: AQL = .010; LTPD = .030;

 We want to develop a double-sampling plan where n1 = n2

We want to develop a double-sampling plan where n1 = n2 (see picture above). Here are the needed parameters:

AQL = .010; LTPD = .030; Producers risk = 0.05; and Consumers risk = 0.10.. (Please use Excell and formulas to follow along)

LE 9A-3 Values for Constructing a Double-Sampling Plan Having a Specified p1 and p2(n1=n2,=0.05,=0.10)