Question: Well test 3. A pressure build up test was conducted to confirm the existence of a sealing fault near a newly drilled well. Data from

 Well test 3. A pressure build up test was conducted to

confirm the existence of a sealing fault near a newly drilled well.

Well test

3. A pressure build up test was conducted to confirm the existence of a sealing fault near a newly drilled well. Data from the test is given in Table Q3 (a) below: Table Q3 (a): Well X pressure build up survey Table Q3(b): Reservoir and fluid properties A total of 14206 STB of oil had been produced before shut-in. Determine whether sealing fault exists and the distance from the well to the fault

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!