Question: Well test 3. A pressure build up test was conducted to confirm the existence of a sealing fault near a newly drilled well. Data from


Well test
3. A pressure build up test was conducted to confirm the existence of a sealing fault near a newly drilled well. Data from the test is given in Table Q3 (a) below: Table Q3 (a): Well X pressure build up survey Table Q3(b): Reservoir and fluid properties A total of 14206 STB of oil had been produced before shut-in. Determine whether sealing fault exists and the distance from the well to the fault
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
