Question: What does adding a pre - measure do to a post - measure training evaluation design? Adding a pre - measure tells you if the
What does adding a premeasure do to a postmeasure training evaluation design?
Adding a premeasure tells you if the training was cost effective.
Adding a premeasure lets you determine what the skill level of trainees was prior to training.
Adding a premeasure tells you whether the trainer had the skills to do the training.
Adding a premeasure lets you know if the trainees were prepared for training.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
