Question: What is a work breakdown structure? Explain in detail the different approaches to developing a WBS. What is the difference between WBS Level 1 and
- What is a work breakdown structure?
- Explain in detail the different approaches to developing a WBS.
- What is the difference between WBS Level 1 and Level 2, 3, &4?
- With regards to the WBS, what is a "deliverable"?
- What is the lowest level of the WBS called?
- Explain the "brainstorming technique" used to develop the WBS? Who should be involved in this technique?
- What is a "child/parent" relationship when developing a WBS?
- How does using sticky notes help to develop a WBS?