What is the critical path of the project, slacks and floats, its duration, and the probability...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
What is the critical path of the project, slacks and floats, its duration, and the probability that the project will finish in 45 days (with optimistic, expected, and pessimistic scenarios)? Activity Immediate predecessor(s) Optimistic Expected Pessimistic ES EF LS LF 0303 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 - A1 A2 A2 A4 A2, A4 A3, A6 A3, A5, A6 A5 A8, A9 A7, A10 2 4 10 1001 6 6 5 15 400004 8 8 3 min 5 12 8 7 6 20 5 10 10 5 st 10 4 6 15 12 9 000 8 25 7 13 12 7 38 38 8 20 11 23 8 16 8 16 16 23 16 23 16 22 17 23 22 42 23 43 23 28 28 33 23 33 23 33 33 43 33 43 43 48 43 48 What is the critical path of the project, slacks and floats, its duration, and the probability that the project will finish in 45 days (with optimistic, expected, and pessimistic scenarios)? Activity Immediate predecessor(s) Optimistic Expected Pessimistic ES EF LS LF 0303 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 - A1 A2 A2 A4 A2, A4 A3, A6 A3, A5, A6 A5 A8, A9 A7, A10 2 4 10 1001 6 6 5 15 400004 8 8 3 min 5 12 8 7 6 20 5 10 10 5 st 10 4 6 15 12 9 000 8 25 7 13 12 7 38 38 8 20 11 23 8 16 8 16 16 23 16 23 16 22 17 23 22 42 23 43 23 28 28 33 23 33 23 33 33 43 33 43 43 48 43 48
Expert Answer:
Related Book For
Introduction to Operations Research
ISBN: 978-1259162985
10th edition
Authors: Frederick S. Hillier, Gerald J. Lieberman
Posted Date:
Students also viewed these general management questions
-
Sunland Company manufactures bowling balls through two processes: Molding and Packaging. In the Molding Department, the urethane, rubber, plastics, and other materials are molded into bowling balls....
-
Serena's Salon accepted a $500 note from a customer in exchange for services. The customer will pay back the note in one year with 8% interest. What is the journal entry for the initial transaction?
-
The following additional information is available for the Dr. Ivan and Irene Incisor family from Chapters 1-5. Ivan's grandfather died and left a portfolio of municipal bonds. In 2012, they pay Ivan...
-
You have learned a great deal about the Internet Protocol (IP). IP is a set of rules for how data is sent across networks and arrive at the intended destination. An IP address is a numeric identifier...
-
An aluminum rod conducts 7.50cal/s from a heat source maintained at 240oC to a large body of water at 27oC. Calculate the rate entropy increases per unit time in this process.
-
Who issues Treasury bills and how are they sold?
-
A partially completed performance report for Quasar Robotics, Inc., is in the Working Papers. Quasar Robotics, Inc., has just completed its first quarter of the fiscal year ended December 31, 20X3....
-
Clovis Supply sells two models of saddles to retail outfittersbasic and custom. Basic saddles sell for $1,000 each and custom saddles sell for $1,500. The variable cost of a basic saddle is $600 and...
-
An airplane manufacturer is trying to prove the fuel economy of their small plane. Nine have been tested. The results in gallons per hour are in the following table. 8.4 8.2 8.0 8.4 8.3 8.0 7.6 7.6...
-
Determine the value of P0, as a function of H, for these two investment alternatives to be equivalent at an interest rate of i = 15% per year: 1.7H 2Po 05 1015 5 10 10 End of Year Po End of Year
-
The Compromise of 1 8 5 0 reauthorized the... Three - Fifths Compromise. Fugitive Slave Clause and Act. Missouri Compromise. Connecticut Great Compromise.
-
Loose coupling means that the classes are mostly independent. If the only knowledge that class A has about B, is what class B has exposed through its interface than that is considered loosely...
-
Baldwin Corporation produces three separate products from a common process with a joint cost of $120,000. Each of the products can be sold at the split-off point or can be processed further and then...
-
Onslow Company purchased a used machine for $240,000 cash on January 2 On January 3, Onslow paid $10,000 to wire electricity to the machine. Onslow paid an additional $2,000 on January 4 to secure...
-
Specify three areas of growth related to leadership development as a school counselor. Locate professional development resources to assist you in the development of each leadership trait. Construct a...
-
A company uses a job cost system. As of January 1, its records showed the following balances: Materials Work in Process Finished Goods (Job No. 211) 13,500 25,800 30,000 The work in process inventroy...
-
Baron Von's Munch House offers an equal number of soups and salads, along with 7 types of sandwiches. He advertises 253 possible pairings of his You-Pick-2 special (where customers pick any two...
-
Suppose the concentration of glucose inside a cell is 0.1 mm and the cell is suspended in a glucose solution of 0.01 mm. a. What would be the free energy change involved in transporting 10-o mole of...
-
Use the scenario given in Prob.16.3-13. (a) Draw and properly label the decision tree. Include all the payoffs but not the probabilities. (b) Find the probabilities for the branches emanating from...
-
Reconsider the example used to illustrate the interiorpoint algorithm in Sec. 8.4. Suppose that (x1, x2) = (1, 3) were used instead as the initial feasible trial solution. Perform two iterations...
-
Generate as many cutting planes as possible from the following constraint for a pure BIP problem: 3x1 + 5x2 + 4x3 + 8x4 10.
-
Discuss what is meant by the tone at the top and why it is important. Further, discuss whether you feel it is ethical to be a whistle-blower.
-
Consider the following independent situations: 1. An international health club sells lifetime memberships costing \($1,500\) which allow the purchaser unlimited use of any of the clubs 300 facilities...
-
The Longo Corporation contracted with The Davis Company to manufacture various metal component parts that would be assembled by Longo before resale to Longos customers. Longo placed its most recent...
Study smarter with the SolutionInn App