Question: What is the formula for expected shut down time? HOMEWORK 1: Shale Oil Company Case Shale Oil Company's Aston, Ohio, manufacturing complex comprises several operating

What is the formula for expected shut down time?
What is the formula for expected shut down time?
HOMEWORK 1: Shale Oil Company Case Shale Oil Company's Aston, Ohio, manufacturing complex comprises several operating units. These units process the crude oil that is pumped through and transform it into a multitude of hydrocarbon products. The units run 24 hours a day, 7 days a week, and must be shut down for maintenance on a predetermined schedule. One such unit is Distillation Unit No. 5, or DUS. Studies have shown that DU5 can operate only 3 years without major equipment breakdowns, and excessive loss of efficiency. Therefore, D5 is shut down every 3 years for cleaning, inspection, and repairs. DUS is the only distillation unit for crude oil in the Aston complex, and its shutdown severely affects all other operating units. Some of the production can be compensated for by Shale refineries in other locations, but the rest must be processed and stored before the shutdown. Without proper planning, a nationwide shortage of Shale gasoline could occur. The time of DUS's shutdown is critical and the length of time the unit is down must be kept to a minimum to limit production loss. Shale uses the regular project management tools for planning and controlling, in order to minimize shutdown time. The first phase of a shutdown is to open and clean the equipment. Inspectors can then enter the unit and examine the damage. Once damages are determined, the needed repairs can be carried out. Repair times can vary considerably, depending on what damage the Inspection reveals. Based on previous inspection records, some repair work is known ahead of time. Thorough cleaning of the equipment is also known to improve the unit's operating efficiency. The attached table lists the many maintenance activities and their estimated completion times 1. What is the expected shutdown time? 2. Based on the expected demand for the stored product this year, it appears that some shortages are possible. Management has received a directive that the shutdown be no longer than 40 days. What is the probability that this deadline will be met? 3. Shale Oil is considering increasing the budget to shorten the shutdown Using as much detail as is available to you at this point, how do you suggest the company

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!