Question: What is the maximum hourly output from a process with four stepshaving outputs of 20 units/hour, 25 units/hour, 30 units/hour and15 units/hour? 20,25,30, or 15

What is the maximum hourly output from a process with four stepshaving outputs of 20 units/hour, 25 units/hour, 30 units/hour and15 units/hour? 20,25,30, or 15

Which error type indicates null hypothesis being rejected whenit is true? 1,2,3,or 4

What is the performance factor of a workstation under 8-hourshift with 20 minutes cleaning and two 30-minute break and nounplanned downtime, cycle time 1 second and 18,000 items produced?.50,.75,.25,or 1.00

What is the Process Capability index (Cp) formula where USL isthe Upper Specification Limit, LSL is the Lower Specification Limitand S is the standard deviation?

Question 12 options:

a)

Cp = (LSL - USL) / 3S

b)

Cp = (LSL - USL) / 6S

c)

Cp = (USL - LSL) / 3S

d)

Cp = (USL - LSL) / 6S

With 300 minutes of working time and 30 minutes of cycle time,calculate the total items which can be produced

Question 15 options:

a)

Insufficient data provided

b)

0.1

c)

9000.0

d)

10

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Economics Questions!