Question: What is the relationship between Technical Performance Measures (TPM) and risk items? When do TPMs trigger risk items for proactive risk mitigation? Describe the contents

  • What is the relationship between Technical Performance Measures (TPM) and risk items?
  • When do TPMs trigger risk items for proactive risk mitigation?
  • Describe the contents of the image below (Figure 34.17 from the textbook) Pick a component that has been identified as an FMEA risk item and describe the technical process for reducing its risk.
A Operator Interactions Time or Operating Cycles Operating Environment Environmental Conditions Threats

A Operator Interactions Time or Operating Cycles Operating Environment Environmental Conditions Threats Hostile Natural Induced Operational Scenarios Unique Identifier linked to Risk Assessment impact Levels of Abstraction identified characterized by by impact System Probability or Likelihood of Occurrence create Failure Mode Consequences manifests Product of Failure as Failure Effect(s) characterized impact Subsystem by characterized by Level of Risk resolved by Assembly initiates Severity Classification Mitigating Actions Subassembly Corrective Actions Part dictate SOPP Changes A Design Modifications

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!