Question: What will determine how the project will be conducted and the funds will be made available for the project? a. The Owner's objective b. The



What will determine how the project will be conducted and the funds will be made available for the project? a. The Owner's objective b. The architect's design c. City hall d. The construction cost estimate e. The contractor bid. QUESTION 2 In the planning stage, constructability analysis will not include which of the following? a. Review drawings and specs for completion (all needed info shown) \& coordination. b. Reviewing contractor bids for award of contract. c. Check specified materials for compatibility d. Plan building sequence e. Consider ease of installation (ex: weather impacted materials) QUESTION 3 Which of following is not one of the scheduling methods used in construction? a. Bar charts b. Velocity Charts c. Line-of-balance Charts d. Network Diagram e. None of the above Which of the following explains site Logistics: a. The application of a thought process that provides the planner with a logical approach to conducting a project in the most efficient and economical manner. b. Organization of site work, including the flow of resources on and off the site, surrounding protections, etc. c. The order and interdependence of activities and their place in the network of activities. The contractor d. (a) \& (b) only e. None of the above QUESTION 5 Strategies for controlling risk factors and managing project safety at the company and project level, include: a. Corporate safety policy b. Site specific safety planning c. Permitting documents d. Site safety supervision e. All of the above QUESTION 7 During construction, who is responsible for the means, methods, techniques, sequences, and procedures? a. The owner b. The architect c. The resident engineer d. The contractor e. All of the above QUESTION 8 Which of the following is not usually shown on contract drawings? a. Maintenance of traffic. b. Means, methods, techniques, sequences, and procedures in construction. c. Asbestos abatement d. Plumbing e. Site access roadway QUESTION 9 Events that consume time (and resources) on a construction project are known as what? a. Projects b. Activities c. Plans d. All of the above
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
