Question: When +/- 2 standard deviation control limits are used in a process control chart, which of the below statements are true? Multiple choice question. Approximately
When +/- 2 standard deviation control limits are used in a process control chart, which of the below statements are true? Multiple choice question. Approximately 95.5% of the time random data points will fall within (inside) the upper and lower control limits. 99.7% of the time random data points will fall beyond (outside) the upper and lower control limits. Approximately 68% of the time random data points will fall within (inside) the upper and lower control limits
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
