Question: When a project is in programing and schematic design phase, the best way to have an idea of the cost is to use: 1 -

When a project is in programing and schematic design phase, the best way to have an idea
of the cost is to use:
1- Subsytem estimate
2- historical cost data estimate
3- detail cost estimate