Question: When choosing a suitable pipe diameter for a project, an optimal solution can be chosen from a cost comparison of the total cost of the

When choosing a suitable pipe diameter for a project, an optimal solution can be chosen from a cost comparison of the total cost of the different alternatives over the life cycle of civil infrastructure (20-50 years). The Total cost = Capital Cost + Operation and Maintenance cost. For pipe-based projects which of the following is true? (more than one is correct)
Question 8Answer
a.
Energy cost decreases with an increase in the pipe diameter for a constant flow rate
b.
Capital cost is not influenced by the pipe diameter
c.
Total cost increases with an increase in the pipe diameter
d.
Energy cost increases with an increase in the pipe diameter for a constant flow rate
e.
Total cost can increase or decrease with an increase in the pipe diameter size.
f.
Total cost decreases with a decrease in the pipe diameter size
g.
Capital cost decreases with an increase in the pipe diameter size
h.
Capital cost increases with an increase in the pipe diameter

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!