Question: When evaluating internal controls to determine if control risk can be lowered, which of the following does the auditor consider? Control Design Control Operation A
When evaluating internal controls to determine if control risk can be lowered,which of the following does the auditor consider?
Control Design Control Operation
A NO NO
B NO YES
C YES YES
D YES NO