When using multiple predetermined overhead rates:
each cost pool's numerator may include direct labor-hours or machine-hours.
each of these rates is multiplied by the estimated amount of the allocation base used by each job.
each cost pool's numerator may include fixed and variable manufacturing overhead.
each cost pool must use the same allocation base, such as direct labor-hours.