Question: Which answer about the dragline is false? Question 3 2 Select one: A . When a final cut is required to expose the edge of

Which answer about the dragline is false?
Question 32Select one:
A.
When a final cut is required to expose the edge of the seam, a pull back operation is applied to pull material back further to the low-wall side.
B.
The primary limitations of draglines are their boom height and reach, which limits where the dragline can dump the waste material.
C.
Another primary limitation is their dig depth, which is limited by the length of rope the dragline can utilise.
D.
Inherent with their construction, a dragline is least efficient excavating material below the level of their base.
E.
A dump operation occurs when the dragrope is released causing the bucket to tilt and empty.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!