Question: which will require 2 0 6 , 8 0 0 direct labor hours: Activity Cost Driver Budgeted Costs for 2 0 2 2 Cost Driver

which will require 206,800 direct labor hours:
Activity Cost Driver Budgeted Costs for 2022 Cost Driver Used as Allocation Base Cost Allocation Rate
Materials handling $ 232,650 Number of parts used $ 0.18 per part
Cutting and lathe work 1,938,750 Number of parts used 3.20 per part
Assembly and inspection 4,549,600 Direct labor hours 22.00 per hour
The following production, costs, and activities occurred during the month of July:
Units Produced Direct Materials Costs Number of Parts Used Direct Labor Hours
4,250 $ 159,80093,50017,850
Required:
Calculate the total manufacturing costs and the cost per unit of the windows produced during the month of July (using the activity-based costing approach).
Note: Round "Cost per unit produced" to 2 decimal places. Do not round intermediate calculations.
Assume instead that Woodland Industries applies manufacturing overhead on a direct labor hours basis (rather than using the activity-based costing system previously described). Calculate the total manufacturing cost and the cost per unit of the windows produced during the month of July. (Hint: You will need to calculate the predetermined overhead application rate using the total budgeted overhead costs for 2022.)
Note: Round "Cost per unit produced" to 2 decimal places. Do not round intermediate calculations.
Which approach do you think provides better information for manufacturing managers?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!