Question: While conducting a detail survey using the GRID system, explain the following: a ) Suppose you are surveying a block with dimension 5 0 x

While conducting a detail survey using the GRID system, explain the following:
a) Suppose you are surveying a block with dimension 50 x 30 metres. Draw the grid lines to conduct this survey.
b) In the following diagram, identify the points on the grid through which the contour 100.800 passes.
c) Using the following data, calculate the spot height:
(i) Higher contour =100.800
(ii) Lower contour =100.600
(iii) Distance from higher contour to grid =18 mm
(iv) Distance between contours =29 mm