Question: Work analysis and design Question 2. Establish the money rate per hundred pieces from the following data: Cycle time (averaged measured time): 1.20 min Basc

Work analysis and design Question
Work analysis and design Question 2. Establish
2. Establish the money rate per hundred pieces from the following data: Cycle time (averaged measured time): 1.20 min Basc rate: $6.60 per h Pieces per cycle: 4 Machine time (power feed): 0.52 min per cycle Allowance: 17 percent on effort time: 12 percent on power feed time Performance rating = 90 percent (25 pt)