Question: Work element 0.61 0.42 0.76 Observed time (min) 0.55 1.10 Determining Standard Times for Worker-Machine Tasks 8 The snapback timing method was used to obtain

Work element 0.61 0.42 0.76 Observed time (min)

Work element 0.61 0.42 0.76 Observed time (min) 0.55 1.10 Determining Standard Times for Worker-Machine Tasks 8 The snapback timing method was used to obtain average times for work elements in one work cycle. The times are given in the table below. Element d is a machine-controlled ele- ment and the time is constant. Elements a, b, c, e, and f are operator-controlled and were performance rated at 80%; however, elements e and fare performed during the machine- controlled element d. The machine allowance is zero (no extra time is added to the machine cycle), and the PFD allowance is 14%. Determine (a) the normal time for the cycle and (b) the standard time for the cycle. a b Element Observed time (min) d e 0.24 0.30 0.17 0.76 0.26 0.14

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!