Question: WORK METHOD ERGONOMIC ANALYSIS METHOD STANDARD, AND WORK DESIGN C. 19. The following activities were observed for a mold operator, Complete a flow process chart

WORK METHOD ERGONOMIC ANALYSIS METHOD STANDARD,

WORK METHOD ERGONOMIC ANALYSIS METHOD STANDARD,

WORK METHOD ERGONOMIC ANALYSIS

METHOD STANDARD, AND WORK DESIGN

C. 19. The following activities were observed for a mold operator, Complete a flow process chart template for the mold operator. a. Operator removes molded piece from die. b. Walks to bench, put the piece into a box, and then puts the box on a pallet Returns to injection molder. d. Blows out dirt from die (with compressed air) e. Sprays oil into die. f. Presses START button on molder and sit down g. The machine closes the die, inject plastic into die and after set curing time of 2min opens itself. Q 20. What is one major problem in the job and how can it be improved. Flow Process Chart Location: Summary Activity Event Present Proposed Savings Date: Operation Operator: Analyst Transport Circle appropriate Method and Type: Method: Present Proposed Delay Inspection Type: Worker Material Machine Storage Remarks Time (min) Distance (ft) Cost Event Description Symbol Time (In Minutes) Distance (In Feet) Method Recommendation 3 D 9 3 D 9 > 3 D 9 3 D 9 3 D 9 C. 19. The following activities were observed for a mold operator, Complete a flow process chart template for the mold operator. a. Operator removes molded piece from die. b. Walks to bench, put the piece into a box, and then puts the box on a pallet Returns to injection molder. d. Blows out dirt from die (with compressed air) e. Sprays oil into die. f. Presses START button on molder and sit down g. The machine closes the die, inject plastic into die and after set curing time of 2min opens itself. Q 20. What is one major problem in the job and how can it be improved. Flow Process Chart Location: Summary Activity Event Present Proposed Savings Date: Operation Operator: Analyst Transport Circle appropriate Method and Type: Method: Present Proposed Delay Inspection Type: Worker Material Machine Storage Remarks Time (min) Distance (ft) Cost Event Description Symbol Time (In Minutes) Distance (In Feet) Method Recommendation 3 D 9 3 D 9 > 3 D 9 3 D 9 3 D 9

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!