Question: Work Study Numerical 4. For following manufacturing operation, Prepare man-machine chart after suggesting all possible improvements. Also find out cycle time. (1) Worker picks up

Work Study Numerical 4. For following manufacturing operation, Prepare man-machine chart after suggesting all possible improvements. Also find out cycle time. (1) Worker picks up raw material from tray 1 minute (2) Worker loads raw material piece in machine 1 minute (3) Worker start machine by using a lever 1 minute (4) Machine runs automatically with auto stop at the end 5 minute (5) Worker unloads finish piece 1 minute (6) Machine throws waste automatically 2 minute (7) Worker inspects finished piece 1 minute (8) Worker packs finished piece in the box 2 minute (9) Worker marks entry in the job card 1 minute

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!