Question: x 2 2 = 1 7 0 0 and x 2 3 = 1 0 0 0 in the optimal solution implies a plant needs
and in the optimal solution implies
a plant needs to be built at potential plant site
in the optimal solution.
the $ fixed operating cost at potential plant site must be paid.
all of the above.
none of the above.