Question: XYZ Manufacturing produces bicycles using a multi - step process: Frame Welding: 1 5 minutes per frame Wheel Assembly: 1 0 minutes per wheel Painting:
XYZ Manufacturing produces bicycles using a multistep process:
Frame Welding: minutes per frame
Wheel Assembly: minutes per wheel
Painting: minutes per bicycle
Final Assembly: minutes per bicycle
The welding machine requires a setup time of minutes for each batch of frames, and the painting station has a changeover time of minutes between different colors. XYZ operates for hours per day. What is the capacity of the welding machine in bicycles per day if the batch size is frames?