Question: y = 1 . 5 t / m 3 a H 4 5 cm 3 0 cm 0 - 3 5 , C = 1

y =1.5 t/m3 a H 45 cm 30 cm 0-35, C =12 kPa 8-23, Ca= C cot/cot 8 y =2t/m3609 Fig. 3.37. A bulldozer blade cutting and moving sandy loam soil. A bulldozer front blade of width 2.5 m is cutting a sandy loam soil as shown, and has built up a pile on top of the original soil surface with an average depth of 45 cm.(a) What is the required draft? (b) What fraction of the total draft is caused by the moving pile above the surface?