Question: You are constructing a haul road section 1 0 0 f t long, 2 4 f t wide and an average of 5 f t
You are constructing a haul road section long, wide and an average of deep. Optimal
moisture for the material is found to be and
How many tons of material do you need to purchase from RE Tucker?
You work it out with the Tuckers that they will be loading the trucks close to tons per cy truck.
What is the buking factor, between the stockpile and the trucks?
Bulking Factor Volume in the truckVolume in the pit
How many yard ton trucks will need to be delivered?
How many gallons of water should you have available to place the fill OR how many gallons
do you need to get rid of by drying?