Question: You are scheduling an assembly line based on EOQ. The setup cost is 4 0 . The holding cost is $ 1 0 per year
You are scheduling an assembly line based on EOQ. The
setup cost is The holding cost is $ per year and the
cost of the part is $ The annual demand is
Compute the EOQ?