Question: You are to develop an operating plan for the manufacture of the assembly provided in Lecture 3 . The HW should include: 1 . The

You are to develop an operating plan for the manufacture of the assembly provided in Lecture 3. The HW should include:
1. The Actual Production Rate/hr.
2. The Decision, to Purchase or Make, for each part.
3. Number of each machine required.
4. Number of each type of operator required.
5. Line Balancing for the Assembly Plan.
Part No.Part Name Quantity/ Material Spec. Fixed VariablePurchase
unit Cost $ Cost $ Cost $
P10 Platform Tread 13/32 Black Rubber Ribbed 8000.0250.03
P20 Patform Top 10.59" HRP&O 1,000,0002.55
P30 Platform Base 10.59" HRP&O 1,000,00023.75
P40 R&L Front Leg 1/10.59" HRP&O 1,000,00024.75
P50 Folding Brace 20.59" HRP&O 1,000,0002.754.5
P60 R&L Rear Leg 1/10.59" HRP&O 1,000,0002.25
P70 Rear Leg Brace 20.59" HRP&O 1,000,00024.8
P80 Stair Tread 23/32 Black Rubber Ribbed 8000.0250.035
P90 Step 20.59" HRP&O 1,000,0004.15.5
P100 Front Leg Brace 20.59" HRP&O 1,000,0001.83.2
P1103/16 Oval Head Tubular Rivet 16 Standard 6,0000.0150.025
P1209/64 Oval Head Tubular Rivet 10 Standard 6000.0150.025
P130 Leg Cap 43/32 Black Rubber Ribbed 8500.0250.04
Assembly Sequence
Activity Description R unit/hr Immediate Predecessors
A Sub-Assemble (1) Platform assembly A11220---
B Remove (1) A11 from monorail & place it on belt conveyor 900 A
C Remove (2) P50 from monorail & place it on conveyor 900---
D Remove (2) P90 from monorail & place it on conveyor 900---
E Remove (2) P60 R&L from monorail & place it on conveyor 900---
F Remove (2) P70 from monorail & place it on conveyor 900---
G Sub-Assemble (2) P-130 to (2) P60 R&L 360 E
H Remove (2) P40 R&L from monorail & place it on conveyor 900---
I Remove (2) P100 from monorail & place it on conveyor 900---
J Sub-Assemble (2) P-130 to P40 R&L 360 H
K Spray Cement to (1) P10 & Apply to A11300 B
L Spray Cement to (1) P80 & Apply to (2) P90300 D
M Assemble (2) P100 with (1) P120250 I
N Assemble (2) P70 with (1) P120250 F
O Assemble (1) P70 to P40 R&L with (4) P120250 J & M
P Assemble (1) P100 to P60 R&L with (4) P120250 G & N
Q Assemble (1) A11 to P40 & P60 with P-110250 B & O & P
R Assemble (2) P90 to Sub-assembly Q with (8) P110100 L & Q
S Assemble (2) P50 to Sub-assembly R with (4) P110150 C & R
T Inspect & carbonized completed Folding Stool 100 S

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!