Question: You are using a single - engine scraper rated at 2 1 c y heaped that is used to haul material from a pit to
You are using a singleengine scraper rated at heaped that is used to haul material from a pit to
a fill away under severe conditions. The average haul speed will be and the average
return speed will be Assume, at an average speed of that is required both to
accelerate and decelerate. The operating efficiency will be equal to a min hour. You will spend
minutes loading this scraper.
A How much material will be carried in each load? Points
B What is the cycle time? Points
C What is the production per scraper per haul ie material moved per hour Points
DBonus Assume the haul and return times are not given. The rolling resistance of the road is
You will be hauling the material down slope at a grade. What is the Total Resistance
of the Haul and the Total Resistance of the Return? Points
EBonus Assume the Rimpull chart provided below is the correct one for this equipment. What
will be the haul and return speeds be What will the revised cycle time be Points
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
