Question: you can solve fast 7. Annually, approximately 1.25 million tons of ore needs to be transported between two ports. The distance between the ports is
you can solve fast
7. Annually, approximately 1.25 million tons of ore needs to be transported between two ports. The distance between the ports is 3000 miles. Compare the economic differences between a bulk carrier loading/unloading by its own means and another bulk carrier using the facilities in the port. Port facilities limit the length of the ship to 225m and the draft to 13m. The ship owner expects a 20% return from his ship, which he intends to operate for 20 years. (40P) Ship Displacement 72100 ton Lightship (without crane) 13000 ton Other DWT components 325 ton Average Ship Velocity 12.5 knot Fuel Consumption 54t HFO + 4t MDO daily Fuel Margin %25 Loading Days at Port 2 days Unloading Days at Port 2 times 8 hour work day + 1 gn manevra Port Expense $10000/RT RT: Round Trip Ship Price 12 million $ Annual Employee Cost $250000 Annual Ship Cost $300000 HFO Price $300/ton MDO Price $600/ton Annual Working Days of the Ship 350 Differences in Ships Unloading Port Units 1100 ton/hour & 0.5 $/ton Ship Crane 2000 ton Unloading Capacity of Ship Crane 2000 ton/hour Price of Ship Crane $3750000 Extra Expense of Ship Crane $80000 (Maintenance) + $20000 (Employee) Limanda Boaltmada Kreyn Yakt tketimi 20 ton/day (MDO) Annual maintenance day of crane 3 day 7. Annually, approximately 1.25 million tons of ore needs to be transported between two ports. The distance between the ports is 3000 miles. Compare the economic differences between a bulk carrier loading/unloading by its own means and another bulk carrier using the facilities in the port. Port facilities limit the length of the ship to 225m and the draft to 13m. The ship owner expects a 20% return from his ship, which he intends to operate for 20 years. (40P) Ship Displacement 72100 ton Lightship (without crane) 13000 ton Other DWT components 325 ton Average Ship Velocity 12.5 knot Fuel Consumption 54t HFO + 4t MDO daily Fuel Margin %25 Loading Days at Port 2 days Unloading Days at Port 2 times 8 hour work day + 1 gn manevra Port Expense $10000/RT RT: Round Trip Ship Price 12 million $ Annual Employee Cost $250000 Annual Ship Cost $300000 HFO Price $300/ton MDO Price $600/ton Annual Working Days of the Ship 350 Differences in Ships Unloading Port Units 1100 ton/hour & 0.5 $/ton Ship Crane 2000 ton Unloading Capacity of Ship Crane 2000 ton/hour Price of Ship Crane $3750000 Extra Expense of Ship Crane $80000 (Maintenance) + $20000 (Employee) Limanda Boaltmada Kreyn Yakt tketimi 20 ton/day (MDO) Annual maintenance day of crane 3 day
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
