Question: You have a short rate term structure model: ln r(t) = ln r(t-1) + m(t)*dt + v(t)*x(t), where x is a Wiener process (standard Brownian
You have a short rate term structure model: ln r(t) = ln r(t-1) + m(t)*dt + v(t)*x(t), where x is a Wiener process (standard Brownian motion). The first drift term is m(0)=-0.08 and the volatility is v(0)=0.18. We are using one year time step. The random draw from standard normal distribution was x=1.3272. The initial one year short rate r(0)=0.21%. What is the next short rate r(1) when using the Monte Carlo simulation with a simple discretization
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts