Question: You have been asked to design a primary clarifier that will treat 2 . 5 MGD of wastewater from a proposed Disney theme park. You
You have been asked to design a primary clarifier that will treat MGD of wastewater from a proposed Disney theme park. You have conducted a batch settling test with an initial suspended solid concentration of to develop criteria for the design of the primary clarifier. The test column was in diameter and high, and sampling ports were located at and from the water surface in the column. The percent removals after the various sampling times are given in the following Table Table
The isoremoval lines are plotted in the following figure Figure The removal line intersects the axis at min
Table Percent removal affer varions sqmpling cimes at differeat sampling por
tabletableTimeiminDapth i
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
