Question: You have been asked to design a primary clarifier that will treat 2 . 5 MGD of wastewater from a proposed Disney theme park. You

You have been asked to design a primary clarifier that will treat 2.5 MGD of wastewater from a proposed Disney theme park. You have conducted a batch settling test with an initial suspended solid concentration of 320mgL to develop criteria for the design of the primary clarifier. The test column was 8in.(203mm) in diameter and 10ft(3.08m) high, and sampling ports were located at 2,4,6,8, and ,1.83,2.44,3.05m) from the water surface in the column. The percent removals after the various sampling times are given in the following Table (Table 2).
The isoremoval lines are plotted in the following figure (Figure 3). The 20% removal line intersects the x axis at 16 min .
Table 2. Percent removal affer varions sqmpling cimes at differeat sampling por
\table[[\table[[Time],[(imin.)]],Dapth (%i)],[2,4,6,8,10
You have been asked to design a primary clarifier

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!