Question: You have been tasked to determine the Bailey bridge design to move the maneuver element across a gap, with a minimum bridge classification of 60.

You have been tasked to determine the Bailey bridge design to move the maneuver element across a gap, with a minimum bridge classification of 60. The reconnaissance data shows the gap to be 128 feet. Data for the near shore shows an unprepared abutment, bank height of 9 feet, and soil consisting of medium compact fine sand. Data for the far shore shows an unprepared abutment, a bank height of 11 feet, and soil consisting of firm clay. A crane is not available for use. Note: Use the above reconnaissance data to complete the Fixed Bridging PE. What is the initial bridge length