Question: You have four components in a system with two working in parallel (i.e. one is a backup to the other) and the other two in

You have four components in a system with two

You have four components in a system with two working in parallel (i.e. one is a backup to the other) and the other two in sequence to the first two (the top of the system in the questions. The first two have reliabilities of 0.55 and 0.6 and the next two have reliabilities of 0.87 and 0.94. What is the reliability of this part of the whole system? Answer to three decimal places. Your Answer: Your Answer Question 4 (1 point) Saved With the booming world economy, the 2x4 lumber consumed in the construction industry is considerably increasing. To obtain the 2x4's that meet the quality requirements the milling system for 2x4's needs to be effective. The following reliability diagram is established. What is the reliability of the milling system? For clarity, the elements which are stacked (with double arrows coming in) are considered backups (0.55 and 0.6 or 0.64, 0.65, and 0.65 for example) while others are considered series. Enter the whole system reliability to three decimal places

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!